date: 2026-11-08

title: "Beyond the Agent Harness: Boundary Criteria for Software-Factory Orchestration"

author: Brian Taylor


Beyond the Agent Harness: Boundary Criteria for Software-Factory Orchestration

Why this matters

Pre-launch discovery clients often blame the model, the harness, or infra based on symptoms without a layer-specific diagnosis. This Nov 2026 case study proposes an operational boundary test and three-field incident coding so an action can be assigned to a layer with an owner and change cadence, instead of vague reliability talk.

Layers

A mechanism is classified by its reach across one operationally defined run:

  • Agent harness — confined to a single run: tools, context within run, permissions, sandbox, loop, LLM integration.
  • Factory harness — coordinates runs, hands state across runs, or updates from run outcomes: schedulers across projects, shared resource locks, retry/idempotency/outbox, preflight checks, cross-loop verification, receipts, runner/cache health.
  • Domain layer — must change when the application domain changes: prompts and checks tied to business rules.
  • Plant — infrastructure under the system: machines, regions, quotas.
  • Model — base model.

Mechanisms in different layers change at different rates and for different reasons, so layer inventory should precede blame.

Incident coding

Each failure gets three separate fields: defect origin, control that failed to stop it, and fix location. Environment attribution requires positive evidence; missing information is recorded as undetermined, not treated as plant. Both coders flagged about half the units ambiguous and recorded 8 to 13 of 20 incident fields undetermined or unrecorded.

Case evidence

  • System F serves six projects with three selectable harnesses and shared runners/locks.
  • 48-run same-condition backend comparison, small N per harness.
  • Verification receipts signed outside the agent sandbox; rejected tamper classes.
  • Oct 2026 maintenance log: about 40 platform fixes, mostly factory-layer (locks, cache health, ancestry checks, dead loops, UNKNOWN receipt, dispatch after environment readiness, credential cleanup for lost tasks).
  • Reliability drills: stop around 0.3 s, six processes cleaned in about 0.279 s after parent termination, status shown as unknown after restart rather than success.
  • Protected test files emerged after agents modified tests/gates; verification must come from somewhere the agent cannot reach.

Inter-rater check and caveats

Two model coders agreed on all 26 mechanism layers and 18 to 19 of 20 incident fields (kappa 0.86 to 0.93). A revised v1.1 that separates mechanism and incident attribution agreed less in sensitivity re-coding (kappa 0.78 to 0.93). Half the units were flagged ambiguous, agreement is not accuracy, and no human coders were tested. Single operator, small samples, same person designed, operated, and evaluated. Treat as preliminary.

Practical translation for consulting

  1. Layer inventory before blame: split controls by layer and change cadence before recommending model or prompt changes.
  2. Use origin/control/fix RCA and forbid environment blame without positive evidence; track unknowns to expose instrumentation gaps.
  3. Keep at least one control outside agent reach: protected tests, independent evaluator, hash-bound receipts outside sandbox.
  4. Report recovery states truthfully: after restart, unknown is valid, success requires verification.
  5. Budget factory/platform work separately from harness and model work; that is where production burden lands.

What this does not claim

No proof that a factory layer beats a better single harness. No independent replication. Agreement is not accuracy. The term software factory is used generically.

Sources: Hua, L. (Nov 2026). Beyond the Agent Harness: Boundary Criteria for Software-Factory Orchestration — A Single-Operator Case Study. arXiv:2611.06946. https://arxiv.org/abs/2611.06946

Sources